UNIT 01 is our main factory which processes the primary production stages. It is settled at new Borg El Arab city 2nd industrial zone, Alex
Stage number one takes place within the knitting section which contains 14 machines that perform all kinds of knitting with a production capacity 4 Tons per day.
Stage number two is dyeing our dyeing house contains 7 machines which perform all stages regarding cotton & polyester dyeing with a production capacity 6 Tons per day.
Stage number three will be printing, our printing section contains two manual and two automatic machines in addition to hand printing tables provided with a tex design software to separate colors. The production capacity is 4000 pieces per day.
Stage number four takes us to marking section where we have Gerber marking machine which covers all the production requirements.
|