Careers | Inquiries | Contact Us | News
UNIT 02 factory is established in new Borg El Arab city 2nd industrial zone, it embraces four production stages starting from cutting till packing and its daily production capacity reaches 40000 pieces daily.

The production capacity in cutting section amounts to 10000 pcs/day: it contains 3 cutting tables, one cutting machine with four scissors two of them are automatic and the rest two are manual
Stage number two is sewing, our sewing section consists of total 189 sewing machines performing all sewing steps 6 lines with 12 sewing machines
Stage number three is ironing with a total 32 ironing tables.

There is a section for embroidery's styles it has 2 embroidery machines.

Stage number four finishing and packing it can finish 25000 pcs/day
UNIT01 - UNIT02 - UNIT03 - UNIT04 Factories Tour